Abstract
References
1
AASHTO (1990), Permanent ground anchor specification in-situ soil improvement technique, AASHTO-AGC-ARTBA TF27.
2
British Standards Institution (1989), British Standard Code of Practice for Ground anchorages, BS 8081.
3
Civil Engineering Department Hong Kong (1997), Model specification for Prestressed Ground Anchors, Geotechnical Control Office, GEOSPEC1.
4
Deutshe Industrie Normen (1990), Ground Anchorages Design, Construction and Testing, DIN-4125.
5
European Committee for Standardization (2009), EUROCODE 7 Execution of special geotechnical work - Ground Anchors, EN 1537.
6
Ground Anchor Technology Association (1997), Design・Construction Guideline for Ground Anchor, Science technology, pp.258-282.
7
Hayashi, T. (1989), Study on the pulling resistance mechanism of the ground anchor of the sandy ground, Ph.D. dissertation at the University of Tokyo, Japan.
8
Kim, J.H. and Jung, H.S. (2016), "Ground Anchor Method for Practitioners".
9
Korea Expressway Corporation (2016), A survey on the application actual condition and establishment of performance improvement countermeasure of permanent anchor for ground reinforcement (In Korean).
10
Lee, S.D. (1997), Soil Testing - Principles and Methods, Kyobobook.
11
Ministry of Land, Transport and Maritime Affairs (2011a), Man-made slope design standard.
12
Ministry of Land, Transport and Maritime Affairs (2011b), Man-made slope construction specification.
13
Ministry of Land, Infrastructure and Transport (2020a), Korean Design Standards (KDS) 11 60 00 : Ground anchor.
14
Ministry of Land, Infrastructure and Transport (2020b), Korean Construction Specification (KCS) 11 60 00 : Ground Anchor.
15
Park, K.D., Yoon, D.W., Heo, I.-Y., Lee, J.G., and Chang, B.S. (2014), "Standard Method Research on the Anchor Pullout Test", Proceedings of Korea Institute for Structural Maintenance Inspection spring conference, Vol.18, No.1, pp.206-209.
16
Park, S.Y., Lee, S.R., Jung, J.H., and Cho, W.J. (2020), "Evaluation of Residual Tensile Load of Field Ground Anchors based on Long-term Measurement", J. of the Korean Geotechnical Society, Vol.36, No.8, pp.35-47.
17
Park, S.-Y., Hwang, B.S., Lee, S.R., and Cho, W.J. (2021), "Prediction of Long-term behavior of Ground Anchor based on the Field Monitoring Load Data Analysis", J. of the Korean Geotechnical Society, Vol.37, No.8, pp.25-35. 10.7843/kgs.2014.30.8.25
18
Song, M.K., Park, S.Y., Lee, S.R., and Cho, W.J. (2019), "Improvement of Lift-off Tests via Field Evaluation of Residual Load in Ground Anchor", J. of The Korean Geotechnical Society, Vol.35, No.5, pp.43-51.
19
Sabatini, P.J., Pass, D.G., and Bachus, R.C. (1999), GEOTECHNICAL ENGINEERING CIRCULAR NO. 4, Ground Anchors and Anchored Systems, Report No. FHWA-IF-99-015, pp.281.
20
The Japanese Geotechnical Society (1990), Ground Anchor Design and Construction Standards, Commetary.
Information
  • Publisher :The Korean Geotechnical Society
  • Publisher(Ko) :한국지반공학회
  • Journal Title :Journal of the Korean Geotechnical Society
  • Journal Title(Ko) :한국지반공학회 논문집
  • Volume : 38
  • No :8
  • Pages :75-84
  • Received Date : 2022-07-14
  • Revised Date : 2022-08-03
  • Accepted Date : 2022-08-04