Abstract
References
2.Lee, M.S., Lee, I.W., and Lee, K.M. (2014), “Embankment Immediate Settlement Analysis of Stress and Pore Pressure by Fluctuations of Ground Water Level”, 2014 Autumn Conference of the Korean Society for Railway, pp.1249-1254. 3.Kerh, T., Hu, Y.G., and Wu, C.H. (2003), “Estimation of Consolidation Settlement Caused by Groundwater Drawdown Using Artificial Neural Networks”, Advances in Engineering Software, Vol.34, No.9, pp. 559-568 4.Choi, C.Y. (2009), “Development of the Integrated Automation Software Development of Railroad Roadbed FEM Analysis & Design”, Railroad track and structure, No.209, pp.41-47. 5.Choi, C.Y., Choi, W.I, Han, S.J., and Jung, J.H. (2013), “Development of Design Method for Reinforced Roadbed”, Railroad track and structure, Journal of the Korean Geotechnical Society Vol.9, No.9, pp.55-69.
Information
- Publisher :The Korean Geotechnical Society
- Publisher(Ko) :한국지반공학회
- Journal Title :Journal of the Korean Geotechnical Society
- Journal Title(Ko) :한국지반공학회 논문집
- Volume : 31
- No :5
- Pages :67-74
- Received Date : 2015-03-12
- Revised Date : 2015-04-16
- Accepted Date : 2015-04-27
- DOI :https://doi.org/10.7843/kgs.2015.31.5.67


Journal of the Korean Geotechnical Society







