Abstract
References
1.Chung, J. S., Oh, S. J., Boo, S. D., and Koo, H. S. (2000), “A Study on Prestressing Order of Tendons for PSC Box Girder Bridges”, Proceedings of Korea Society of Civil Engineers (KSCE) Conference 1993, KSCE, pp.51-54. 2.Ha, S. S., Cho, K. R., Kim, S. H., Moon, J. H., and Lee, L. H. (2004), “An Experimental Study on the Structural Behavior of the PC Beam-Column Exterior Joint wIih Strand”, Journal of Architectural Institute of Korea Structure & Construction, Vol.20, No.10, pp. 119-126. 3.Jeong, G. H., Yu, C. D., Cho, S. H., Hwang, K. T., Kim, T. H., and Jung, D. (2004), “A Trend Study of Shield Segment in Japan & Korea”, Proceedings of Korean Tunneling Association (KTA) 2004 Symposium, Seoul, Korea. 4.KICTTEP (Korea Institute of Construction & Transportation Tech-nology Evaluation and Planning) (2010), “Planning Research of TBM Technical Development for Mechanization and Automation in Tunnelling”, Planning Research Report of KICT. 5.KICT (Korea Institute of Construction Technology) (2012), “Develop-ment of Cable Assembling System of Segment Tunnel Lining for Economics Improvement Leakage Reduction”.
Information
- Publisher :The Korean Geotechnical Society
- Publisher(Ko) :한국지반공학회
- Journal Title :Journal of the Korean Geotechnical Society
- Journal Title(Ko) :한국지반공학회 논문집
- Volume : 29
- No :6
- Pages :33-51
- Received Date : 2013-03-20
- Accepted Date : 2013-06-13
- DOI :https://doi.org/10.7843/kgs.2013.29.6.33


Journal of the Korean Geotechnical Society







