All Issue

2024 Vol.40, Issue 5 Preview Page
31 October 2024. pp. 131-142
Abstract
References
1

Byeon, H.Y. and Kim, J.S. (2014), "Foundation and Column Reinforcement Technology of Existing Building (New Excellent Technology Certification No.629, No. 682)", Building Construction, J. of the Korea Institute of Building Construction, Vol.14, No.3, pp.68-76.

2

Choi, C.H., Cho, S.D., Yoo, Y.C., Choi, K.S., and Cho, S.H. (2014), Development of Preloading Method for Reinforcement Piles of Apartment Remodeling(II), Research Report, Korea Institute of Civil Engineering and Building Technology, pp.1-188.

3

Choi, C.H., Lee, H.J., Choi, K.S., You, Y.C., and Kim, J.Y. (2017), "A Study of Prestressed Concrete Pile Stiffness for Structural Analysis of Condominium Remodeling with Vertical Story Extension", J. of the Korean Geotechnical Society, Vol.33, No.12, pp.81-92.

4

Choi, J.J. and Ha, S.J. (2020), Development of Design and Construction Process for Load-Distribution Technique of Pile Foundation (Pre-loading Method), Research Report of Korea Agency for Infrastructure Technology Advancement, pp.5-56.

5

Jeong, S.S. and Cho, H.C. (2019), "A Study on the Load Distribution Ratio and Axial Stiffness on Existing and Reinforcing-Pile in Vertical Extension Remodeling", J. of the Korean Geotechnical Society, Vol.35, No.1, pp.17-30.

6

KHS (2008), Korea Highway Bridge Design Standard, Explanation, pp.885-887.

7

KRC (2012), Pile Foundation Design Guideline, Korea Rail Network Authority, pp.76-77.

8

MOLIT (2013), Housing Act, Korea Ministry of Land, Infrastructure and Transport, p.2.

9

MOLIT (2014), Vertical Extension Remodeling Structure Standard, Korea Ministry of Land, Infrastructure and Transport, Notice No. 2014-341.

10

Song, H.M., Won, J., Son, S.W., and Kim, J.S. (2024), Preloading Method using Reinforcing Pile's Preloading System using Additional Load, Certificate of Patent No.10-2655814.

11

Song, H.M., Won, J., Son, S.W., and Kim, J.S. (2024), Preloading Method using Reinforcing Pile's Preloading System, Certificate of Patent No.10-2655813.

12

Wang, C.C., Han, J.T., Jang, Y.E., Ha, I.S., and Kim, S.J. (2018), "Study on the Effectiveness of Preloading Method on Reinforcement of the Pile Foundation by 3D FEM Analysis", J. of the Korean Geotechnical Society, Vol.34, No.1, pp.47-57.

Information
  • Publisher :The Korean Geotechnical Society
  • Publisher(Ko) :한국지반공학회
  • Journal Title :Journal of the Korean Geotechnical Society
  • Journal Title(Ko) :한국지반공학회 논문집
  • Volume : 40
  • No :5
  • Pages :131-142
  • Received Date : 2024-10-24
  • Revised Date : 2024-10-25
  • Accepted Date : 2024-10-25