All Issue

2026 Vol.42, Issue 3
30 June 2026. pp. 7-30
Abstract
References
1

American Petroleum Institute (API) (2000), Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms (API RP 2A-WSD), 21st Edition, Washington, D.C.

2

Jung, C.K. (2004), Research on field application of static end loading test, PhD’s Thesis, Kyungsung University, 2004. pp. 6.

3

KFLT-Cell Pte.Ltd. (2015), CONSTRUCTION OF MAXWELL STATION FOR THOMSON-EAST COAST LINE(CONTRACT T223)K-cell load test report of UPLT©-PTB02(Barrette 2.0m X 0.8m).

4

KFLT-Cell Pte.Ltd. (2016), CONTRACT T308 CONSTRUCTION OF MARINE TERRACE STATION & TUNNELS FOR THOMSON-EAST COAST LINE, K-cell load test report of UPLT©-PTB02(Barrette 2.0m X 0.8m).

5

KFLT-Cell Pte.Ltd. (2017), CONTRACT T301 CONSTRUCTION OF 4 IN 1 RAIL AND BUS DEPOT AND RECEPTION TUNNELS FOR THOMSON-EAST COAST LINE, K-cell load test report of UPLT©-PTB04(Barrette 1.0m X 2.8m).

6

KFLT-Cell Pte.Ltd. (2018), CONTRACT 715 CONSTRUCTION OF CUT AND COVER AND BORED TUNNELS FOR NEL EXTENTION, K-cell load test report of UPLT©-PTB01(Barrette 1.2m X 3.0m).

7

KFLT-Cell Pte.Ltd. (2018), CONSTRUCTION OF KIM CHUAN DEPOT EXTENTION FOR CIRCLE LINE 6 (C821A), K-cell load test report of UPLT©-B2(Barrette 1.0m X 3.0m).

8

KFLT-Cell Pte.Ltd. (2019), CONSTRUCTION OF CUT AND COVER TUNNELS AT MARINA BAY AREA FOR CIRCLE LINE 6 (C886), K-cell load test report of UPLT©-TBRP01 (Barrette 1.2m X 2.8m).

9

KFLT-Cell Pte.Ltd. (2019), CONSTRUCTION OF NORTH SOUTH CORRIDOR (TUNNEL) BETWEEN KAMPONG JAVA ROAD AND SUFFOLK WALK (N103), K-cell load test report of UPLT©-PTB02(Barrette 1.0m X 3.0m).

10

KFLT-Cell Pte.Ltd. (2020), CONSTRUCTION OF NORTH SOUTH CORRIDOR (TUNNEL) BETWEEN KAMPONG JAVA ROAD AND SUFFOLK WALK (N103), K-cell load test report of UPLT©- PTB05(Barrette 0.8m X 2.8m).

11

KFLT-Cell Pte.Ltd. (2021), CONSTRUCTION OF UNDERGROUND INFRASTRUCTURES (T316), K-cell load test report of UPLT©-PTB02(Barrette 1.2m X 2.8m).

12

KFLT-Cell Pte.Ltd. (2021), CONSTRUCTION OF UNDERGROUND INFRASTRUCTURES (T316), K-cell load test report of UPLT©-PTB03(Barrette 1.2m X 2.8m).

13

KFLT-Cell Pte.Ltd. (2021), Integrated Development of a 230KV Underground Substation, Operation Support Centre and Future Commercial Building at Labrador Villa Road, K-cell load test report of UPLT©-PTB01(Barrette 0.8m X 2.8m).

14

Poulos, H. G. and Davis, E. H. (1980), Pile Foundation Analysis and Design, John Wiley & Sons, New York.

15

Schmertmann, J. H. (1978), Guidelines for Cone Penetration Test Performance and Design, Federal Highway Administration, Report No. FHWA-TS-78-209.

Information
  • Publisher :The Korean Geotechnical Society
  • Publisher(Ko) :한국지반공학회
  • Journal Title :Journal of the Korean Geotechnical Society
  • Journal Title(Ko) :한국지반공학회 논문집
  • Volume : 42
  • No :3
  • Pages :7-30
  • Received Date : 2025-05-19
  • Revised Date : 2026-06-19
  • Accepted Date : 2026-06-22