American Petroleum Institute (API) (2000), Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms (API RP 2A-WSD), 21st Edition, Washington, D.C.
Jung, C.K. (2004), Research on field application of static end loading test, PhD’s Thesis, Kyungsung University, 2004. pp. 6.
KFLT-Cell Pte.Ltd. (2015), CONSTRUCTION OF MAXWELL STATION FOR THOMSON-EAST COAST LINE(CONTRACT T223)K-cell load test report of UPLT©-PTB02(Barrette 2.0m X 0.8m).
KFLT-Cell Pte.Ltd. (2016), CONTRACT T308 CONSTRUCTION OF MARINE TERRACE STATION & TUNNELS FOR THOMSON-EAST COAST LINE, K-cell load test report of UPLT©-PTB02(Barrette 2.0m X 0.8m).
KFLT-Cell Pte.Ltd. (2017), CONTRACT T301 CONSTRUCTION OF 4 IN 1 RAIL AND BUS DEPOT AND RECEPTION TUNNELS FOR THOMSON-EAST COAST LINE, K-cell load test report of UPLT©-PTB04(Barrette 1.0m X 2.8m).
KFLT-Cell Pte.Ltd. (2018), CONTRACT 715 CONSTRUCTION OF CUT AND COVER AND BORED TUNNELS FOR NEL EXTENTION, K-cell load test report of UPLT©-PTB01(Barrette 1.2m X 3.0m).
KFLT-Cell Pte.Ltd. (2018), CONSTRUCTION OF KIM CHUAN DEPOT EXTENTION FOR CIRCLE LINE 6 (C821A), K-cell load test report of UPLT©-B2(Barrette 1.0m X 3.0m).
KFLT-Cell Pte.Ltd. (2019), CONSTRUCTION OF CUT AND COVER TUNNELS AT MARINA BAY AREA FOR CIRCLE LINE 6 (C886), K-cell load test report of UPLT©-TBRP01 (Barrette 1.2m X 2.8m).
KFLT-Cell Pte.Ltd. (2019), CONSTRUCTION OF NORTH SOUTH CORRIDOR (TUNNEL) BETWEEN KAMPONG JAVA ROAD AND SUFFOLK WALK (N103), K-cell load test report of UPLT©-PTB02(Barrette 1.0m X 3.0m).
KFLT-Cell Pte.Ltd. (2020), CONSTRUCTION OF NORTH SOUTH CORRIDOR (TUNNEL) BETWEEN KAMPONG JAVA ROAD AND SUFFOLK WALK (N103), K-cell load test report of UPLT©- PTB05(Barrette 0.8m X 2.8m).
KFLT-Cell Pte.Ltd. (2021), CONSTRUCTION OF UNDERGROUND INFRASTRUCTURES (T316), K-cell load test report of UPLT©-PTB02(Barrette 1.2m X 2.8m).
KFLT-Cell Pte.Ltd. (2021), CONSTRUCTION OF UNDERGROUND INFRASTRUCTURES (T316), K-cell load test report of UPLT©-PTB03(Barrette 1.2m X 2.8m).
KFLT-Cell Pte.Ltd. (2021), Integrated Development of a 230KV Underground Substation, Operation Support Centre and Future Commercial Building at Labrador Villa Road, K-cell load test report of UPLT©-PTB01(Barrette 0.8m X 2.8m).
- Publisher :The Korean Geotechnical Society
- Publisher(Ko) :한국지반공학회
- Journal Title :Journal of the Korean Geotechnical Society
- Journal Title(Ko) :한국지반공학회 논문집
- Volume : 42
- No :3
- Pages :7-30
- Received Date : 2025-05-19
- Revised Date : 2026-06-19
- Accepted Date : 2026-06-22
- DOI :https://doi.org/10.7843/kgs.2026.42.3.7


Journal of the Korean Geotechnical Society







